  5. An investigation with recommendations of the present conditions surrounding the caisson extension to the main breakwater at the port of Cape Town
 
Loading...
Thumbnail Image

An investigation with recommendations of the present conditions surrounding the caisson extension to the main breakwater at the port of Cape Town

Author(s)
Lourens, Deon Willem
Date Issued
1997
Type
Thesis
Publisher
Cape Technikon
Abstract
The idea for this study occurred when movement of the caisson extension to the
breakwater was observed.
The major concern was, what would happen if the caisson breakwater extension
failed? What would the financial implications be to the port?
The CSIR have carried out a number of studies with regards to the safety of the
structure. The consequences of caisson failure and the possible effects on the port
were however not investigated.
When it was determined that settlement was taking place, information concerning
the condition of the caisson structure and factors influencing the structure were
gathered. Investigations on the following were done:
(a) Extent of caisson settlement.
(b) Sediment movement around the structure.
(c) Foundation condition.
(d) Wave impacts of long and short period waves on the Ben Schoeman Dock in
the event of caisson failure. (Refraction and diffraction).
(e) Financial implications due to possible container operation downtime at Ben
Schoeman Dock in the event of caisson failure.
(f) The tourist potential of the structure.
The conclusion reached in this study was that the Ben Schoeman Dock would not
be adversely effected if partial or complete failure of the main breakwater should
take place. One could even question the length of the extension and whether it was
actually required.
The recommendations of this study would be as follows follows:
Maintain the caisson extension in good condition as it will be important
for possible future extensions to the port.
Develop the breakwater as it is an asset which has potential for
tourism to Cape Town.
Additional information
Thesis (Masters Diploma (Engineering))--Cape Technikon, 1997
Subjects

Breakwaters

Breakwaters -- Design...

Harbors -- Design and...

Harbors -- South Afri...

File(s)
Loading...
Thumbnail Image
Name

Lourens_DW_MTech_civil_eng_1997

Size

8.39 MB

Format

Adobe PDF

Checksum

(MD5):abb864eb06dd55a57961949fd126f3ff

  • Metrics
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your Institution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify