Repository logo
  • English
  • Deutsch
  • Español
  • Français
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. ETD - Faculty of Engineering and Built Environment
  3. Faculty of Engineering - Department of Electrical, Electronic and Computer Engineering
  4. Electrical, Electronic and Computer Engineering - Master's Degree
  5. Efficiency plan for large interconnected urban ring main network under contingency conditions
 
Loading...
Thumbnail Image

Efficiency plan for large interconnected urban ring main network under contingency conditions

Author(s)
Iindombo, Julia Dimbulukweni
Date Issued
2011
Type
Thesis
Publisher
Cape Peninsula University of Technology
Abstract
In a situation, where there is a shortage of power generation or the power stations are operating with a very low reserve margin, as is typically the current position in South Africa, there is a need to operate distribution network at the highest possible efficiency by utilising network power loss reduction techniques. Such techniques are especially important when contingencies occur as they tend to increase loss, reduce efficiencies and cause power supplies to such networks to increase. This increase can cause the network or multiples of such networks to be load shed as the power stations do not have the reserve margins to meet this increased demand. The ideal situation would thus be to minimise network loss and in so doing decrease the amount of power needed and possibly avoid load shedding. Thus, there is a need to study efficiency, network loss reduction under contingency conditions and this is the focus of the research.
Most large urban distribution networks are operated as ring main networks. Ring networks are considered to have less power loss. However, a major component in a ring network can cause the loss to substantially increase; resulting in power shortage in the network. There is an urgency to eliminate high network loss.
An efficiency plan was developed for a large ring network that reduces the loss so that its input power can be decreased. In this way, the available power existing due to the contingency can be more evenly spread, and the number of ring main networks to be load shed could be reduced.
Additional information
Thesis (MTech(Electrical Engineering))--Cape Peninsula University of Technology, 2011
Subjects

Networks (Electrical)...

Electric circuits

Ring networks (Comput...

Electric power system...

Distributed generatio...

File(s)
Loading...
Thumbnail Image
Name

Iindombo_JD_MTech_Efficiency plan for a large interconnected.pdf

Description
Thesis
Size

1.92 MB

Format

Adobe PDF

Checksum

(MD5):f6a2aea1ba1ddde5d7bc7bdc6317543d

  • Metrics
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your Institution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify