Repository logo
  • English
  • Deutsch
  • Español
  • Français
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. ETD - Faculty of Engineering and Built Environment
  3. Faculty of Engineering - Department of Industrial and Systems Engineering
  4. Industrial and Systems Engineering - Master's Degree
  5. Improving outage process maturity level using a process maturity model
 
Loading...
Thumbnail Image

Improving outage process maturity level using a process maturity model

Author(s)
Petersen, Mervyn
Date Issued
2016
Type
Thesis
Publisher
Cape Peninsula University of Technology
Abstract
The research study establishes the maturity level of the outage process of the Outage Management Department at Eskom. The outage process started in 2012 to contribute to the effective planning and execution of outages. The successful completion of outages depends on effective planning and execution of an outage. At the time of the research study, poor outage performance at Eskom’s power stations contributed to load shedding of electricity in South Africa.
The research problem statement reads as follows: The absence of an outage process maturity indicator diminishes the ability of the Outage Management Department (OMD) to comprehend the current process maturity level. The research question: Will the Outage Management Department be able to identify improvement opportunities if the maturity level of the outage process is established? The key research objectives are:
• To consider how process maturity enables improvement.
• To identify critical elements in an outage process.
• To determine what is included in outage planning, control and improvement.
• To identify a suitable process maturity model.
• To identify a measurement instrument to determine the maturity level of Eskom’s outage process
The research study uses a descriptive research design and applies the survey research method. Greener and Martelli’s (2015: Online) Business Research Process (Sources: Greener & Martelli, 2015: Online) is used together with Farooq’s Research Steps for Survey Research (2015, Online). The survey questionnaire adopted from Smith’s Maintenance Planning and Scheduling Maturity Matrix (2013: Online) was used to develop the survey questionnaire. The author developed the Outage Management Maturity Framework by combining Business Process Management Maturity model and a Maintenance Planning and Scheduling Maturity Matrix.
The research finding is that a process maturity model can determine the maturity level of the outage process and is useful as a process improvement tool. The research findings rank the maturity level of the outage process at Level 2, Experimenting.
Additional information
Thesis (MTech (Quality))--Cape Peninsula University of Technology, 2017.
Subjects

Electric power failur...

Electric utilities --...

Electric power supply...

File(s)
Loading...
Thumbnail Image
Name

197091512-Petersen-Mervyn-M.Tech-Quality-Eng-2017.pdf

Description
Theses
Size

1.96 MB

Format

Adobe PDF

Checksum

(MD5):bcc23f0af5d10aa157afee68cde10719

  • Metrics
Get Involved!
  • Source Code
  • Documentation
  • Slack Channel
Make it your own

DSpace-CRIS can be extensively configured to meet your needs. Decide which information need to be collected and available with fine-grained security. Start updating the theme to match your Institution's web identity.

Need professional help?

The original creators of DSpace-CRIS at 4Science can take your project to the next level, get in touch!

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify